I've matched the old bracket sheets to their own drawing revisions, but the only note supporting stronger restraint says looked straight in jig; before our UR5e review inherits that recommendation, can quality establish the first released result and what correction followed on an identified bracket?
Which released bracket check should precede a stronger-restraint proposal?
AmaraChan1122 · 2026年3月28日 08:47 UTC
主帖中文翻译暂不可用,以下显示英文原文;回复保留原文。 查看英文原文
0 条回复
讨论已关闭
此讨论已连续六个月没有活动,现已关闭新回复。 最后活动: .