Machine supplier's 'ready' means it received our housing request. Integrator's 'ready' means the loading area is available. My interface sheet uses the same word for both.
I want separate names, owners and clearing conditions, then a walkthrough where the request arrives while the previous housing still occupies the area. Receipt needs to remain visible without being mistaken for permission to load; the engineered safety functions stay separate from this ordinary job interface.
FR10 loading request receipt called ready on both sides
JasperChan1073 · 2026年4月23日 22:16 UTC
主帖中文翻译暂不可用,以下显示英文原文;回复保留原文。 查看英文原文
0 条回复
讨论已关闭
此讨论已连续六个月没有活动,现已关闭新回复。 最后活动: .