Our FR5 monitor counts the retained PLC completion again after reconnect. Same job, extra tally. I'm checking saved job identity before touching the handshake; clearing the bit would hide the problem.
简体中文界面。帖子、指南及政策正文保留原文;未对原文作自动翻译。
reconnecting adds a housing we never inspected twice
TheoBrooks0845 · 2025年6月17日 02:32 UTC
0 条回复
讨论已关闭
此讨论已连续六个月没有活动,现已关闭新回复。 最后活动: .