I proposed using Fairino FR10 for fixture loading with a machined spacer in a compact contract manufacturing shop, starting with 50. My estimate covered the arm and gripper but left fixture work and staff effort unclear, which has frustrated my colleague.
I'd like to define a small pilot that gives both of us a fair basis for judging the idea.
Fairino FR10: My colleague has a point about the missing labour
AnnaBrown0938 · 2026年8月31日 10:56 UTC
主帖中文翻译暂不可用,以下显示英文原文;回复保留原文。 查看英文原文