I need a complete tooling comparison before buying for aluminium-housing inspection-nest loading. Both FR5 suppliers argue suitability from the housing mass, but the assembly has extended fingers, an adapter and hose fittings. What information should each provide for the actual loaded arrangement and planned motion?
简体中文界面。帖子、指南及政策正文保留原文;未对原文作自动翻译。
FR5 housing-tool quotes both stop at the bare part mass
NoraBaker0496 · 2026年8月22日 18:51 UTC