An old completion closes our newer inspection attempt

NadiaChan1074 · 2025年8月10日 13:02 UTC

已关闭

主帖中文翻译暂不可用,以下显示英文原文;回复保留原文。 查看英文原文

NA
NadiaChan1074
I can make our offline FR5 inspection tracker accept attempt one's result as attempt two's result. Both use the same coupon identifier. Random delays only catch it occasionally, which makes a poor handover test. I want to hold the first completion, start the second attempt, then release the old message on demand. Is a queued event test enough, provided it also covers duplicates and reconnection?

0 条回复

讨论已关闭

此讨论已连续六个月没有活动,现已关闭新回复。 最后活动: .