I can make our offline FR5 inspection tracker accept attempt one's result as attempt two's result. Both use the same coupon identifier. Random delays only catch it occasionally, which makes a poor handover test.
I want to hold the first completion, start the second attempt, then release the old message on demand. Is a queued event test enough, provided it also covers duplicates and reconnection?
简体中文界面。帖子、指南及政策正文保留原文;未对原文作自动翻译。
An old completion closes our newer inspection attempt
NadiaChan1074 · 2025年8月10日 13:02 UTC