Our UR5e inspection screen counted the same bracket twice after reconnect. PLC completion never went low. Nobody requested another check. I need a clear recovery status for the operator, not a count that improves when the cable falls out.
简体中文界面。帖子、指南及政策正文保留原文;未对原文作自动翻译。
One bracket checked, two jobs on the screen
VictorBrooks0794 · 2025年1月31日 13:13 UTC
0 条回复
讨论已关闭
此讨论已连续六个月没有活动,现已关闭新回复。 最后活动: .