I'm testing our inspection-cycle tracking tracking offline for a setup using Fairino FR10 in a workshop fixture-checking station, with a sample bracket as a reference. An earlier attempt's completion incorrectly completes a newer attempt if I deliver it after that attempt starts.
I need repeatable delayed and duplicate event tests because the random sleeps aren't reliable.
My inspection-cycle tracking tracker mixes up consecutive attempts (Fairino FR10)
LucyBarnes0567 · 2026年5月21日 17:36 UTC
主帖中文翻译暂不可用,以下显示英文原文;回复保留原文。 查看英文原文