We're planning planning repeatable welding of bracket assemblies with Fairino FR5 on a steel gusseted bracket assembly in a precision fabrication quality department. Our old inspection notes say it looks aligned while restrained, then falls outside the drawing requirement after release. I want to untangle fit-up, fixture location and final inspection before our new cell inherits an unexplained correction routine.
This is a records review, not live welding adjustment.
简体中文界面。帖子、指南及政策正文保留原文;未对原文作自动翻译。
Which old measurements can actually guide our fixture review?
NoahBennett0716 · 2026年4月24日 20:06 UTC