I'm commissioning an FR10 fixture-checking station and our monitor counts a retained completion again after reconnect. The housing has not had another inspection. How should we link that signal to the inspection it belongs to? I don't want a reconnect to submit work or wipe away evidence we still need.
our inspection count grows when the monitor comes back
HanaBrooks0796 · 2026年6月14日 22:33 UTC
主帖中文翻译暂不可用,以下显示英文原文;回复保留原文。 查看英文原文