I'm commissioning an FR10 fixture-checking station and our monitor counts a retained completion again after reconnect. The housing has not had another inspection. How should we link that signal to the inspection it belongs to? I don't want a reconnect to submit work or wipe away evidence we still need.
简体中文界面。帖子、指南及政策正文保留原文;未对原文作自动翻译。
our inspection count grows when the monitor comes back
HanaBrooks0796 · 2026年6月14日 22:33 UTC