I've just found why our old bracket measurements looked like two different processes: half belong to a thicker variant, but the job description is identical. I'm preparing the FR5 welding proposal and the fixture has adjustment marks for both. I need a way to link each inspection result to the actual variant and fixture setup before anyone copies the offsets.
简体中文界面。帖子、指南及政策正文保留原文;未对原文作自动翻译。
Our fixture review spreadsheet mixed two bracket thicknesses
ElenaCarter1036 · 2026年9月4日 08:48 UTC