I have put both interpretations of ready on our UR5e spacer-loading sequence. The machine supplier means it has received the request. The integrator means the loading area is available. In our example, receipt can happen while the machine is still finishing its work, so these cannot be the same transition. Is a sequence walkthrough with that example the clearest way to get the two teams to agree their interface?
Should request receipt and loading-area availability be separate interface events?
JaneBennett0771 · 2026年3月1日 14:36 UTC
主帖中文翻译暂不可用,以下显示英文原文;回复保留原文。 查看英文原文
0 条回复
讨论已关闭
此讨论已连续六个月没有活动,现已关闭新回复。 最后活动: .