I sent our fixture drawing before buying the FR10, and the unnamed Chinese seller confirmed the configuration. The delivered label suffix and tool-interface bracket look different. Thirty-seven days of equivalence assurances without a comparison. Tooling stays unfitted; what would you need before deciding whether this delivered arrangement is usable?
简体中文界面。帖子、指南及政策正文保留原文;未对原文作自动翻译。
Delivered FR10 suffix and bracket interface differ from our confirmed drawing
MeiBaker0516 · 2026年7月28日 09:22 UTC