We're planning planning repeatable welding of bracket assemblies with Universal Robots UR5e on a gusseted angle-bracket assembly in a precision fabrication quality department. Our old inspection notes say it looks aligned while restrained, then falls outside the drawing requirement after release. I want to untangle fit-up, fixture location and final inspection before our new cell inherits an unexplained correction routine.
This is a records review, not live welding adjustment.
Separating fit-up, restraint and final inspection
GraceCarter1016 · 2026年8月4日 09:04 UTC
主帖中文翻译暂不可用,以下显示英文原文;回复保留原文。 查看英文原文