简体中文界面。帖子、指南及政策正文保留原文;未对原文作自动翻译。

What should count as dimensional acceptance after welding?

MayaBarnes0562 · 2026年5月27日 05:47 UTC

回复讨论
MA
MayaBarnes0562
I'm reviewing historical records for our planned defining dimensional control for bracket welding with Fairino FR5 and a steel gusseted bracket assembly in a small steel assemblies factory. The notes describe alignment under restraint but dimensions outside the drawing requirement after release. I'd like to distinguish incoming fit-up, fixture location and final acceptance before carrying an unexplained correction routine into the new cell; no live welding adjustments are involved.

0 条回复

参与讨论

欢迎来到 Application Robot

所有人都可以阅读论坛。登录或注册后即可发起讨论、回复或上传照片。

忘记密码?

注册账号即表示你同意我们的 使用条款 社区准则。请阅读我们的 隐私政策 ,了解我们如何处理你的信息。