I'm reviewing historical records for our planned defining dimensional control for bracket welding with Fairino FR5 and a steel gusseted bracket assembly in a small steel assemblies factory. The notes describe alignment under restraint but dimensions outside the drawing requirement after release.
I'd like to distinguish incoming fit-up, fixture location and final acceptance before carrying an unexplained correction routine into the new cell; no live welding adjustments are involved.
简体中文界面。帖子、指南及政策正文保留原文;未对原文作自动翻译。
What should count as dimensional acceptance after welding?
MayaBarnes0562 · 2026年5月27日 05:47 UTC