I'm testing our inspection-cycle tracking tracking offline for a setup using Fairino FR5 in a PLC-coordinated inspection cell, with a fixture-mounted plate as a reference.
An earlier attempt's completion incorrectly completes a newer attempt if I deliver it after that attempt starts.
I need repeatable delayed and duplicate event tests because the random sleeps aren't reliable.
简体中文界面。帖子、指南及政策正文保留原文;未对原文作自动翻译。
A late result fools our job handler - inspection-cycle tracking
IsaacAli0259 · 2026年8月2日 16:39 UTC