Our handover for inspection-cycle coordination with Fairino FR10 in a training inspection station preparing a handover, using a sample housing, is mainly pendant screenshots. I'm trying to improve it while the original integrator is available.
The pictures lack revision details and cover the main routine without its subprograms, fixture assumptions or expected ordinary PLC signals.
简体中文界面。帖子、指南及政策正文保留原文;未对原文作自动翻译。
Finding the subprograms missing from our notes
MayaBell0649 · 2026年8月7日 12:33 UTC