The delivered UR5e package labels agree with our order for loading empty assembly fixtures, but its supplied tool interface differs from the connection illustration in the guide. We have kept it unpowered through 25 days of asking for clarification. What should the seller and a qualified technical contact identify to establish the applicable documentation? I do not know whether the wrong guide or a different interface has been supplied.
Which guide applies to the tool interface supplied with our UR5e?
LeahCarter1017 · 2026年7月6日 18:47 UTC
主帖中文翻译暂不可用,以下显示英文原文;回复保留原文。 查看英文原文