I'm reviewing historical records for our planned preparing robotic welding of gusseted brackets with Fairino FR10 and a fabricated gusseted mounting bracket in a small steel assemblies factory.
The notes describe alignment under restraint but dimensions outside the drawing requirement after release.
I'd like to distinguish incoming fit-up, fixture location and final acceptance before carrying an unexplained correction routine into the new cell; no live welding adjustments are involved.
简体中文界面。帖子、指南及政策正文保留原文;未对原文作自动翻译。
What should count as dimensional acceptance after welding? (Fairino FR10)
OmarBarnes0578 · 2026年8月1日 16:32 UTC