When our monitor reconnects, a completion signal retained from before the outage can be treated as a new completion.
We're tracking inspection completion tracking with Universal Robots UR5e in a fixture-checking station under commissioning, using an inspection coupon.
I'm trying to reconcile the signal with its job, without automatic resubmission or simply clearing the retained state.
简体中文界面。帖子、指南及政策正文保留原文;未对原文作自动翻译。
The first read after reconnect fools our application (inspection completion tracking)
GraceBrooks0842 · 2026年8月30日 12:05 UTC