I'm testing our sample acceptance bookkeeping tracking offline for a setup using Fairino FR10 in a bench cell preparing for commissioning, with a reference housing as a reference. An earlier attempt's completion incorrectly completes a newer attempt if I deliver it after that attempt starts.
I need repeatable delayed and duplicate event tests because the random sleeps aren't reliable.
简体中文界面。帖子、指南及政策正文保留原文;未对原文作自动翻译。
Reproducing delayed events without random sleeps (Fairino FR10, sample acceptance bookkeeping)
MayaBell0649 · 2026年5月23日 09:03 UTC