I'm reviewing an FR5 welding plan that calls a clamped fit check final acceptance, although the old route includes correction after release; where should the separate finished-part check be defined?
简体中文界面。帖子、指南及政策正文保留原文;未对原文作自动翻译。
Which bracket check belongs after fixture release?
MayaBarnes0562 · 2025年7月12日 04:01 UTC