I showed my colleague a small FR5 block-loading proposal with the arm and gripper priced. She asked who was making the tray fixture and covering my normal work while I developed it. I had numbers for neither.
We still think the job might suit a pilot, but I want a bounded comparison with manual loading, fixture cost, setup and another operator trying the handover. How should I define that first trial without turning her reasonable cost question into a request to fund the whole cell?
简体中文界面。帖子、指南及政策正文保留原文;未对原文作自动翻译。
Cannot price an FR5 pilot while my fixture hours are free
ZaraBennett0743 · 2025年9月7日 09:24 UTC
0 条回复
讨论已关闭
此讨论已连续六个月没有活动,现已关闭新回复。 最后活动: .