I'm reviewing historical records for our planned reviewing fixtures for welded mounting brackets with Fairino FR5 and a gusseted angle-bracket assembly in a welded-bracket fabrication workshop. The notes describe alignment under restraint but dimensions outside the drawing requirement after release. I'd like to distinguish incoming fit-up, fixture location and final acceptance before carrying an unexplained correction routine into the new cell; no live welding adjustments are involved.
简体中文界面。帖子、指南及政策正文保留原文;未对原文作自动翻译。
Fairino FR5: Separating fit-up, restraint and final inspection
CarlaAli0227 · 2026年5月2日 11:25 UTC