Our handover for part inspection with Fairino FR5 in a workshop fixture inspection cell, using a fixture-mounted coupon, is mainly pendant screenshots.
I'm trying to improve it while the original integrator is available.
The pictures lack revision details and cover the main routine without its subprograms, fixture assumptions or expected ordinary PLC signals.
Our notes omit the PLC signals the routine expects (part inspection)
AmyCarter0989 · 2026年9月2日 15:07 UTC
主帖中文翻译暂不可用,以下显示英文原文;回复保留原文。 查看英文原文