I need the machine team and integrator to stop using one word for different states. The machine supplier's ready means request received; the integrator reads it as loading area available. What shared interface description would make that difference testable in our spacer-loading plan, including what happens when preparation is still incomplete?
简体中文界面。帖子、指南及政策正文保留原文;未对原文作自动翻译。
ready means two different things in our ur5e lathe draft
RobinBrown0947 · 2026年6月24日 11:34 UTC