I need the machine team and integrator to stop using one word for different states. The machine supplier's ready means request received; the integrator reads it as loading area available. What shared interface description would make that difference testable in our spacer-loading plan, including what happens when preparation is still incomplete?
ready means two different things in our ur5e lathe draft