Can't select the FR5 from this point-only unloading sketch

LiamBarnes0577 · 2025年6月4日 17:17 UTC

已关闭

主帖中文翻译暂不可用,以下显示英文原文;回复保留原文。 查看英文原文

LI
LiamBarnes0577
I have seen a reachable fixture become inaccessible once the fingers were drawn. Our polymer-blank unloading sketch is at that stage now. What complete geometry should I request before the arm selection?

15 条回复

SA
SaraArcher0374

Request the quoted gripper and adapter with the blank held. Include the machine opening, open door and fixture. The designer also needs the proposed approach and withdrawal.

23分
LI
LiamBarnes0577

Quoted tool is still provisional. We have the adapter drawing, but the finger length is awaiting the toolmaker. Door shown shut in the only machine model.

19分
HE
HenryBarnes0525

Then get the actual door positions measured. No point polishing a robot layout around a door that isn't where the job needs it

10分
LI
LiamBarnes0577

Machine supplier is supplying the open-door details. Toolmaker offered a maximum proposed tool envelope while the fingers are being designed. Useful for screening, I think.

1分
SA
SaraArcher0374

Useful while it is clearly provisional. Put the envelope revision beside any comparison, so purchasing does not carry a screening result into the final order.

18分
JA
JaneBaker0510

Include the setter's access too. The arm is not the only thing going through that opening.

21分
GA
GabrielBell0627

Yes. Ours nearly left a fixture change needing access through the proposed base. Lovely unloading route, impossible ordinary maintenance. Ask the setter to walk through the drawing before the base becomes sacred.

21分
HE
HenryBarnes0525

Gabriel, did moving the base solve yours or did the tool have to change too?

7分
GA
GabrielBell0627

We didn't reach a final arrangement in that review. Got the toolmaker involved and stopped the base decision. Still waiting on the revised combination, so I can't offer a magic new position.

12分
LI
LiamBarnes0577

Our setter marked the fixture removal route. It crosses the first base location. Designer is comparing another location, with the open door now included.

18分
JA
JaneBaker0510

Can the setter still reach the fixings there, not just move the fixture past it?

16分
LI
LiamBarnes0577

That is being checked. Moving the base clears the removal route on paper, but I have not called the service access acceptable yet.

1分
SA
SaraArcher0374

Ask the toolmaker to confirm whether the provisional envelope still covers the latest design. Several drawing changes can happen while everyone is discussing the base.

21分
LI
LiamBarnes0577

It does not. Latest fingers extend beyond the first envelope. Thank you for that check, Sara. Both candidate locations are going back through the access review.

12分
GA
GabrielBell0627

That's frustrating, but at least the base isn't installed. Do they now have one agreed drawing set, or are revisions still arriving separately?

23分

讨论已关闭