简体中文界面。帖子、指南及政策正文保留原文;未对原文作自动翻译。

FR10 packing quote with an empty fixture-development line

HarishBrooks0837 · 2025年11月23日 12:25 UTC

已关闭
HA
HarishBrooks0837
I've separated staff handling, setter work and waiting in our pilot comparison. This carton-packing quote still leaves fixture development and recovery training unpriced, while the total looks temptingly final. What's a useful first paid stage when those answers aren't available yet?

4 条回复

GA
GabrielAli0192

Can they price a bounded fixture study before committing to the full cell?

22
HA
HarishBrooks0837

They can price an initial study, but their draft excludes our operator's time and any sample fixture material. I've asked for those assumptions before agreeing the limit. A capped supplier invoice isn't the whole spend.

15
GA
GabrielAli0192

Has that revised scope come back with a decision point before further spending?

13
HA
HarishBrooks0837

Scope is back with sample materials and our attendance identified. Study price still pending. My colleague and I will decide whether to fund the next stage after its result, not treat the study as a deposit on a cell.

18

讨论已关闭

此讨论已连续六个月没有活动,现已关闭新回复。 最后活动: .