I have the machine door measured on this fixture-exchange view, but the supplier still draws only the cylindrical blank and pickup point; which complete open and loaded tool views should I request before the revised base position gets called accessible?
简体中文界面。帖子、指南及政策正文保留原文;未对原文作自动翻译。
Another FR5 exchange view without the complete tool
HarishCarter1011 · 2026年3月8日 14:44 UTC
0 条回复
讨论已关闭
此讨论已连续六个月没有活动,现已关闭新回复。 最后活动: .