I have the machine door measured on this fixture-exchange view, but the supplier still draws only the cylindrical blank and pickup point; which complete open and loaded tool views should I request before the revised base position gets called accessible?
Another FR5 exchange view without the complete tool
HarishCarter1011 · 8 Mar 2026, 14:44 UTC
0 replies
Discussion closed
This discussion is closed to new replies after six months without activity. Last activity: .