Our fixture-loading sketch shows the polymer blank entering, but no gripper body or open door. What should I request?

15 条回复

TO
TobyAbbott0057

Can the integrator combine the measured machine opening with the complete proposed tool and held blank through loading, release and empty withdrawal?

17
AD
AdaCarter0999

They will, once the machine owner supplies the open-door survey. Complete tool model is available.

20
HA
HanaAdams0100

Does the model include the grip depth, or is the blank parked wherever it makes the doorway look widest?

8
AD
AdaCarter0999

Grip depth is specified. Door survey arrived; the original approach puts the rear fitting against the door.

13
LI
LinBennett0705

Which alternatives are actually available in the bay? A side position is worth nothing if it occupies the machine's required service space.

21
DA
DavidBrown0954

Can the setter mark their fixture-change route on that survey too? The robot route and the person's route need to coexist, not take turns being omitted.

10
AD
AdaCarter0999

Lin, a farther frontal stand is available. David, setter marked the change route. Side space is unavailable.

7
TO
TobyAbbott0057

Ask for the farther position with the same fitted assembly, grip and full exchange sequence, including the setter's marked route.

4
AD
AdaCarter0999

Farther position clears the door in the completed model. Empty withdrawal and the receiving placement are also shown.

5
HA
HanaAdams0100

Has anyone checked how the operator loads and removes the receiving tray at that position?

21
DA
DavidBrown0954

Hana's question is separate from my fixture-change route. Ada, both tasks need their real working space in the final layout.

10
AD
AdaCarter0999

Both checked with the operators. Farther stand preserves them, but needs a longer supply presentation area.

6
LI
LinBennett0705

Is that extra area available and priced, or still a note beside the drawing?

24
AD
AdaCarter0999

Available and costed. We selected the farther position for the proposal with the revised presentation area included.

20
TO
TobyAbbott0057

Give the stand supplier that complete accepted layout revision, so its scope includes the checked access spaces rather than only the FR10 mounting point.