简体中文界面。帖子、指南及政策正文保留原文;未对原文作自动翻译。

The FR5 estimate now includes a second carton bench

MiaBaker0470 · 2026年4月21日 06:57 UTC

回复讨论
MI
MiaBaker0470
I've already separated the people doing different jobs in our carton-loading estimate, but the layout now needs another bench to prepare the inserts. That's floor space and another handoff, not just a line for a bit of furniture. The FR5 price hasn't changed. The complete job has, and I'm struggling to see what we'd actually gain with someone still feeding boxed modules and building cartons beside it. Training and cover for that job aren't priced either.

11 条回复

NA
NaomiArcher0419

Price the work at both benches over the same order. Where does a finished carton go, and who brings back the empty supplies? Easy to lose that walk between the neat boxes on a layout.

15
JA
JasperCarter0986

Does the arm remove an awkward reach or mainly move a box that somebody already has in their hand? I'd keep those benefits separate. A smaller financial saving can be acceptable, but someone has to say what else they're buying.

8
MI
MiaBaker0470

Mostly the latter, Jasper. There's a reach across the carton at present, but the proposed bench change could put it closer for hand loading too. Naomi, the same packer carries finished cartons to the closing bench.

13
AN
AnikaChan1117

Then price the closer hand-loading position as well. Otherwise the robot gets credit for a bench move you could make without it.

0
HA
HassanAdams0095

And ask your relief packer to try the proposed supply arrangement; your regular person may already know tricks that won't be in the training price.

15
NA
NaomiArcher0419

Anika, yes, but don't quietly remove insert preparation from the manual comparison either. That work still exists even if the new layout makes it less noticeable.

12
MI
MiaBaker0470

We tried a closer manual carton position with both packers. Neither needed the long reach, and the relief packer spotted that our proposed supply shelf hid the module labels. We've changed that position in the sketch; insert prep stayed in both timings.

12
AN
AnikaChan1117

That's already something useful from the exercise. Has the full robot price caught up with these changes, or are you still comparing it with the first offer?

11
MI
MiaBaker0470

The revised total is back, including the extra preparation bench and cover training. We're not taking the FR5 proposal forward: the remaining saving is too small for us. The closer manual position is being kept, with the shelf change.

11
JA
JasperCarter0986

Sensible to stop while it's still drawings and trials. I dropped a pallet proposal after the complete estimate shrank the saving; the arm price wasn't the part that had been wrong there either.

18
HA
HassanAdams0095

Give the relief packer credit for catching the hidden labels, that is exactly the sort of everyday problem a tidy supplier layout can miss.

9

参与讨论

欢迎来到 Application Robot

所有人都可以阅读论坛。登录或注册后即可发起讨论、回复或上传照片。

忘记密码?

注册账号即表示你同意我们的 使用条款 社区准则。请阅读我们的 隐私政策 ,了解我们如何处理你的信息。