FR10 housing stop video starts after the useful part

OliverAbbott0015 · 2026年3月26日 22:45 UTC

已关闭

主帖中文翻译暂不可用,以下显示英文原文;回复保留原文。 查看英文原文

OL
OliverAbbott0015
Our FR10 fixture-loading ticket has spent 23 days coming back for more information. I supplied the installed job and fixture identity, but the video begins with the rigid housing already waiting and the operator explaining that it has stopped. Support wants the preceding condition, which is reasonable, except nobody has named the condition or said whether our existing recording contains it. I can arrange a better capture with our integrator; I cannot keep asking an operator to film the same stationary housing and hope a different person likes it.

1 条回复

EL
ElliotBell0683

When the demonstrator talks through that wait, do they actually point to the condition the job is waiting for, or only tell your operator what usually happens next?

18分

讨论已关闭

此讨论已连续六个月没有活动,现已关闭新回复。 最后活动: .