简体中文界面。帖子、指南及政策正文保留原文;未对原文作自动翻译。

Our bracket allowance excludes the correction technician

AnikaAllen0334 · 2026年3月6日 16:49 UTC

回复讨论
AN
AnikaAllen0334
First released failures are recorded. Correction time isn't. Who should observe the actual work before our UR5e estimate proceeds?

8 条回复

LE
LeoBrooks0797

Have fabrication and quality follow an ordinary identified group, with the person doing correction involved. Record fit-up, location, first released result and any correction and reinspection separately, including who leaves other work to do it.

18
AM
AmyAdams0119

An observer needs cover as well. Who can actually stay with that group from release through correction, rather than drop in at the end and ask everyone to remember?

8
AN
AnikaAllen0334

Supervisor assigned an observer and covered the technician's other station. Ordinary group selected, not retained failures.

14
MI
MinaChan1120

Does the group identify the exact fitted fixture arrangement? The repair machining date can differ from the date changed parts went into use. I am untangling that distinction in another set of records.

22
AN
AnikaAllen0334

Fitted arrangement confirmed against the return-to-use sign-off. Quality paired each first released reading with its final disposition.

18
AM
AmyAdams0119

Has the observation shown the competing work as well as hands-on correction? You may need cover for a station even when the correction itself is brief.

9
AN
AnikaAllen0334

Yes. Observation records both. Planner is costing actual cover; correction no longer appears as free inspection time.

10
LE
LeoBrooks0797

Does the purchase still make sense with that allowance? Useful to settle it before the fixture proposal promises an improvement nobody has demonstrated.

10

参与讨论

欢迎来到 Application Robot

所有人都可以阅读论坛。登录或注册后即可发起讨论、回复或上传照片。

忘记密码?

注册账号即表示你同意我们的 使用条款 社区准则。请阅读我们的 隐私政策 ,了解我们如何处理你的信息。