Our bracket allowance excludes the correction technician

AnikaAllen0334 · 2026年3月6日 16:49 UTC

已关闭

主帖中文翻译暂不可用,以下显示英文原文;回复保留原文。 查看英文原文

AN
AnikaAllen0334
First released failures are recorded. Correction time isn't. Who should observe the actual work before our UR5e estimate proceeds?

8 条回复

LE
LeoBrooks0797

Have fabrication and quality follow an ordinary identified group, with the person doing correction involved. Record fit-up, location, first released result and any correction and reinspection separately, including who leaves other work to do it.

18分
AM
AmyAdams0119

An observer needs cover as well. Who can actually stay with that group from release through correction, rather than drop in at the end and ask everyone to remember?

8分
AN
AnikaAllen0334

Supervisor assigned an observer and covered the technician's other station. Ordinary group selected, not retained failures.

14分
MI
MinaChan1120

Does the group identify the exact fitted fixture arrangement? The repair machining date can differ from the date changed parts went into use. I am untangling that distinction in another set of records.

22分
AN
AnikaAllen0334

Fitted arrangement confirmed against the return-to-use sign-off. Quality paired each first released reading with its final disposition.

18分
AM
AmyAdams0119

Has the observation shown the competing work as well as hands-on correction? You may need cover for a station even when the correction itself is brief.

9分
AN
AnikaAllen0334

Yes. Observation records both. Planner is costing actual cover; correction no longer appears as free inspection time.

10分
LE
LeoBrooks0797

Does the purchase still make sense with that allowance? Useful to settle it before the fixture proposal promises an improvement nobody has demonstrated.

10分

讨论已关闭

此讨论已连续六个月没有活动,现已关闭新回复。 最后活动: .