简体中文界面。帖子、指南及政策正文保留原文;未对原文作自动翻译。

The bracket's final pass belongs to a different drawing revision

MinaAli0250 · 2026年2月21日 03:39 UTC

已关闭
MI
MinaAli0250
Our FR5 welding proposal borrows an old bracket correction story, but I found a later drawing revision beside the final pass and an earlier one beside the clamped check, so I want to know whether we're even discussing the same requirement.

11 条回复

JA
JaneBennett0771

Check the actual changed requirement with quality before comparing the readings. A revision change may be relevant or administrative, and the record needs to say which rather than leave you guessing from the letter.

6
MI
MinaAli0250

Quality says the locating face used for the final check changed, so our apparent before-and-after pair is using two different references, which rather spoils its career as a correction measurement.

7
AM
AmaraChan1122

Then remove the calculated movement, but retain both original checks with their own references so the history does not become another unexplained blank.

21
BR
BrunoAli0191

Was the physical bracket corrected as well? Different references explain the bad comparison but don't tell you whether someone still had work to do between those entries.

9
MI
MinaAli0250

Fabrication confirms correction happened, Bruno, but cannot recover an amount or active time against that bracket, so I can describe the route without putting a number on it.

14
MI
MinaBrown0946

Who is deciding what current work to observe before that number returns to the estimate?

10
JA
JaneBennett0771

Use the current drawing and fixture set for that observation, with the first released check recorded before correction. Keep incoming fit-up separate from the fixture seating check as well.

18
MI
MinaAli0250

MinaBrown, process specialist and quality chose the current set, and Jane's first-release entry is on its traveller rather than a note someone is supposed to remember later.

0
BR
BrunoAli0191

I'd keep waiting separate from active correction time too. The gap between inspection entries can be mostly queue, even when somebody really did correct the bracket.

6
MI
MinaAli0250

First observations now separate those stages: some passed at first release, others needed correction, and the long waits were mostly for the return check, so the old revision-mixed calculation is out of our cost sheet.

11
JA
JaneBennett0771

That gives you a current baseline. Has the proposed fixture been compared with it yet, or is that the next stage?

9

讨论已关闭

此讨论已连续六个月没有活动,现已关闭新回复。 最后活动: .