Our aluminium-blank exchange sketch has the target point and robot but no complete gripper or open machine door. What exactly am I meant to approve from that?
At most a starting layout, because the integrator still needs the loaded tool, door movement and withdrawal route before anyone can call it usable access
Starting layout is fair. Purchasing's email called it a completed reach check. I've asked them to change that description while the machine owner supplies the door geometry.