简体中文界面。帖子、指南及政策正文保留原文;未对原文作自动翻译。

The FR10 monitor calls an already-high completion new

AmyChen1163 · 2026年8月24日 18:01 UTC

回复讨论
AM
AmyChen1163
Our inspection-coupon monitor reconnects and treats retained completion as another finished job. The signal was already high before the outage. I want the old job reconciled before anyone clears state or automatically submits again.

3 条回复

HA
HanaAdams0100

What survives the outage that identifies the inspection attempt, apart from the completion level?

14
AM
AmyChen1163

The application has a saved job name, but that name is reused. No attempt identifier in this capture. I've kept the event unresolved and asked controls what history is available on its side.

12
HA
HanaAdams0100

Can the operator see unresolved explicitly, rather than a saved job name that looks like a confirmed match?

23

参与讨论

欢迎来到 Application Robot

所有人都可以阅读论坛。登录或注册后即可发起讨论、回复或上传照片。

忘记密码?

注册账号即表示你同意我们的 使用条款 社区准则。请阅读我们的 隐私政策 ,了解我们如何处理你的信息。