Put both against the same job boundary. Incoming carton condition, presentation, transfer, changeover, recovery and handover. Show priced items, allowances and work not yet defined separately. A blank feeding method is not the same sort of uncertainty as a few extra fitting hours.
简体中文界面。帖子、指南及政策正文保留原文;未对原文作自动翻译。
The affordable FR5 quote keeps acquiring another job
FinnBailey · 2025年9月16日 08:35 UTC
16 条回复
First supplier begins with filled presentation trays. Second begins with loose cartons at the packing bench. No wonder the first looked cheaper. I had compared totals before comparing what they actually included.
14分Ask both to start at your real packing output. They can propose different presentation methods, but their cost needs to include getting to those neat starting positions.
9分Both now have the same incoming carton description. The first is pricing tray preparation. We have also asked for the application safeguarding review and defined training scope, not just guarding to suit.
9分How many operators and maintainers need that training, and whose time is included in the supplier price? Attendance and shift cover may remain an internal cost.
14分Three operators and one maintainer. Quote allowed one attendee. Our shift cover was missing too. That is now in our internal estimate rather than another argument about the supplier's day rate.
11分You can use ranges for uncertain fitting work if the assumptions are visible. I would not bury an undecided presentation system inside a general contingency, though. That needs a proposal before the range means much.
19分And include someone other than the demonstrator operating after the agreed handover. I've seen a training price cover a pleasant visit without testing whether the next shift can use the setup.
20分Price replacement presentation parts and their expected supply route as well. If a damaged tray stops the whole flow, the cheapest initial arrangement can leave you with expensive waiting later.
-3分Replacement tray and finger references requested, Noah. The first supplier's preparation option is back. It needs an operator filling trays, so our running labour comparison now includes that instead of just the transfer cycle.
12分Does the preparation occur once per batch or continuously as the robot consumes trays? That distinction should be visible in the staffing assumption.
14分Continuously during the order, Harish. Batch setup is separate. I had called both preparation, which hid how much attendance the first option needed.
16分That is worth taking back to your colleague now. You have a more useful comparison even while the supplier still owes some prices. The missing work has a name and an owner.
4分Have the suppliers completed their remaining proposals, or are you still comparing a defined method with an outline? Curious whether one is actually cheaper once the boundary matches.
14分Not finished. Both presentation methods are defined now, but the safeguarding and full handover prices remain provisional. We agreed to keep the decision open rather than declare the larger honest estimate the losing bid.
21分Keep that same distinction on the summary page. People often read the bold total and miss the sentence explaining what it still excludes.
9分讨论已关闭
此讨论已连续六个月没有活动,现已关闭新回复。 最后活动: .