Has purchasing agreed to retain the old packed construction, or is that only the layout designer's suggestion?
简体中文界面。帖子、指南及政策正文保留原文;未对原文作自动翻译。
Why does our FR5 layer need cartons receiving may stop buying?
ElliotBaker0509 · 2026年1月11日 02:39 UTC
16 条回复
Only the suggestion. Purchasing says the alternative supplier was being considered because the old construction has become awkward to source, not because anyone fancied a different box colour.
12分Then compare both actual packed constructions, because restricting supply to save this pattern might cost more than changing the pattern.
10分And receiving needs a way to distinguish them if both arrive during a changeover; same outside dimensions will not tell the operator which layer instruction applies.
-8分Could the current stock be handled under the existing packing route while a pattern for the new construction is reviewed, rather than forcing one proposed cell to accommodate an undefined transition?
19分Amara, that sounds worth pricing, but who has confirmed the new construction is becoming the standard rather than remaining a second source?
16分Neither decision made yet, Mina. Purchasing now has three explicit options: retain the old pack, approve the new one as another source, or change over fully. We've stopped describing that as a tooling detail.
6分Show the different support arrangements beside those choices, not only the purchasing prices; nobody should choose a cheap box and accidentally commit to an expensive cell revision.
10分Amara's transition option also needs somewhere for old stock to go, even if it stays manual; returning half-used supplies can make a tidy cutoff surprisingly untidy.
12分We've counted the old packed stock and part-used supplies. Existing packing can use them without changing its route. That gives us a real transition option, rather than assuming the cupboard empties itself.
7分Thanks for checking the part-used supplies as well; they are usually the last bits to announce that the changeover was not quite finished.
2分Have packaging and tooling actually assessed a layer for the new construction now?
20分They've assessed a non-alternating candidate for the new packed construction together, including the finger exit and our partial orders. It uses fewer cartons per layer. Dispatch has priced the extra movements; purchasing has the full comparison.
7分Then the layer count can finally be one cost among the others, instead of the rule that decides which cartons everyone is allowed to buy.
14分Decision made: use up old stock on the existing route and proceed with the reviewed lower-count candidate for the new construction. We aren't ordering old cartons just to preserve the alternating sketch. Receiving has the two identities and the transition instruction.
14分That answers the supply question too. Keep the construction identity on the purchase line, so the next same-size substitute doesn't restart this argument.
8分讨论已关闭
此讨论已连续六个月没有活动,现已关闭新回复。 最后活动: .