The bracket inspection blocks changed but the acceptance heading did not

IsaacBaker0520 · 2025年11月9日 11:38 UTC

已关闭

主帖中文翻译暂不可用,以下显示英文原文;回复保留原文。 查看英文原文

IS
IsaacBaker0520
I've found two sets of measuring blocks behind our FR10 bracket proposal, with different top contacts and the same handwritten description. The final passes also come after a correction operation. I can keep the finished brackets as examples, but I don't know which historical dimensions are fair to compare before we ask for a new fixture.

11 条回复

AN
AnnaBennett0764

Start by matching each result to the actual support arrangement and process stage. The same heading cannot make those measurements equivalent. Can the inspector identify when the block set changed, or only that both sets were used?

19分
IS
IsaacBaker0520

Only that both were used. We still have the blocks and some stamped brackets. The sheet doesn't record which blocks supported which bracket, so a nice continuous chart is looking optimistic.

22分
FA
FarahAli0243

You can leave the chart as historical data with that limit visible. I would not use it to estimate improvement from the proposed fixture. Does the corrected finished example have an identified acceptance method?

1分
SA
SamAdams0159

Isaac, could quality compare the two support contacts with one identified retained bracket before anyone orders replacement blocks? That might explain why the distinction matters, even if it cannot repair the old records.

12分
HE
HenryBaker0438

Farah, do you mean the current acceptance method or the one used for that historical finished example?

4分
FA
FarahAli0243

The method used for the historical example, Henry. Its finished dimensions may still be useful, but I should not imply that today's method was necessarily used then.

6分
IS
IsaacBaker0520

Farah, that historical method is identified for one retained final sample. Sam, quality will compare the block contacts with it. Nobody expects that to recover the missing before-correction dimensions.

8分
AN
AnnaBennett0764

That final sample can explain the required finished shape. For the new fixture study, ask quality and the process owner to define checks before restraint, after release and after any correction, using the intended method at each stage.

14分
SA
SamAdams0159

Anna, would you retain correction time with those checks too? Purchasing could otherwise read a final pass as all the work the fixture needs to do.

0分
AN
AnnaBennett0764

Yes, with the decision and actual extra work recorded. Not an assumed allowance copied from the old chart. The study needs to show whether correction is required, what it involves and who performs it.

11分
IS
IsaacBaker0520

I've added that to the study request. Thanks Sam for the modest block comparison idea; we can understand the contacts without pretending it rebuilds a history nobody recorded. New measurements are still to be agreed.

16分

讨论已关闭

此讨论已连续六个月没有活动,现已关闭新回复。 最后活动: .