I'm reviewing the historical basis for our UR5e bracket fixture proposal. The notes describe alignment under restraint, then a released assembly outside the drawing. Before we carry over a correction routine, how should I distinguish fit-up and locating evidence from final acceptance? No live welding changes are involved.
The bracket drawing fails only after the old restraint is removed
RosaCarter0988 · 2026年7月26日 09:30 UTC
主帖中文翻译暂不可用,以下显示英文原文;回复保留原文。 查看英文原文