We're planning preparing robotic welding of gusseted brackets with Fairino FR10 on a fabricated gusseted mounting bracket in a welded-bracket fabrication workshop.
Our old inspection notes say it looks aligned while restrained, then falls outside the drawing requirement after release.
I want to untangle fit-up, fixture location and final inspection before our new cell inherits an unexplained correction routine.
This is a records review, not live welding adjustment.
Does the inspection procedure define the released condition and reference supports? Check that alongside whether each old measurement says how the assembly was held.