简体中文界面。帖子、指南及政策正文保留原文;未对原文作自动翻译。

Our bracket sheet uses aligned for two different checks

WillBarnes0574 · 2026年4月12日 16:08 UTC

回复讨论
WI
WillBarnes0574
The UR5e proposal assumes our old bracket correction routine will remain. Its starting evidence is an aligned tick before welding and a failed angle reading after release. I want to know what that tick actually checked.

7 条回复

AN
AnnaChen1199

Ask the original checker what they looked at. A tick can be a fit-up observation without being a measurement of the angle that later failed.

13
WI
WillBarnes0574

Setter says the tick meant the holes lined up with the fixture pins. Nobody measured the released angle at that stage. The estimate described it as an initial angle pass.

15
HA
HazelBrown0919

Correct the description first. Hole fit and the final angle are different checks (even if somebody called both alignment). Keep the hole observation, but don't turn it into the missing angle reading.

9
AN
AnnaChen1199

Does the failed angle reading belong to an identified bracket before its correction?

9
WI
WillBarnes0574

Yes, the traveller links that failure and the later pass to the same bracket. Quality is setting out the check stages and supports so the next example includes an actual first released measurement.

15
WI
WillBarnes0574

New linked example completed. The first released angle fails and the post-correction check passes on the agreed support. Fabrication is reviewing fit-up and location; our estimate no longer describes the old hole check as an angle result.

11
AN
AnnaChen1199

Thanks for closing that wording loop. Does the costing copy now show the same limited evidence as quality's sheet?

22