Sorting restart state before running 236

NadiaBaker0465 · 2026年8月29日 00:20 UTC

回复讨论

主帖中文翻译暂不可用,以下显示英文原文;回复保留原文。 查看英文原文

NA
NadiaBaker0465
My Universal Robots UR5e program picks a small aluminum block, places it and advances the pocket during tray-to-tray transfer in a small fixture loading area. Clean runs work. After a stop between actions, the saved pocket sometimes doesn't match reality. We've 236 planned, and I want recovery sorted before normal production depends on it.

4 条回复

HA
HarishBell0663

Where does the index advance in your trace, relative to placement confirmation? Start with the sequence you've, not where the number ought to change

10分
NA
NadiaBaker0465

It advances before placement confirmation. So after a stop, the number can describe the next intended pocket rather than a transfer we know finished. That's on my sequence.

13分
HA
HarishBell0663

Map the transfer stages offline, with an agreed completion confirmation. Have your integrator define how saved state is reconciled with tool and pocket conditions; unknown conditions need an explicit recovery route

22分
NA
NadiaBaker0465

So just moving the increment isn't enough? I'd hoped this was one badly placed line, which would've been embarrassing but convenient.

11分

参与讨论

欢迎来到 Application Robot

所有人都可以阅读论坛。登录或注册后即可发起讨论、回复或上传照片。

忘记密码?

注册账号即表示你同意我们的 使用条款 和 社区准则。请阅读我们的 隐私政策 ,了解我们如何处理你的信息。