Our UR5e housing unloader waits halfway through some runs and the seller we bought from through Alibaba keeps asking for a better video. Mine shows the arm and tray, but I need to know which screen information matters. Cannot keep sending longer films of a stationary arm.

21 条回复

CH
ChenAdams0094

On ours the active program line explained a similar pause. It was waiting for the next station, although we first described it as a robot fault. Does your screen show the step name when it stops?

15
LE
LeahAdams0147

Yes, but the operator usually presses acknowledge before I arrive. We need to catch that first. I can see why my video wasn't much help.

7
CH
ChenAdams0094

Could the operator photograph the message before acknowledging it? Then you can send its exact wording with the time, rather than everyone trying to remember what it said afterwards.

15
LE
LeahAdams0147

We've agreed that. The last saved events mention a tray request, but I cannot tie them confidently to the filmed occurrence because I didn't record its time.

-2
CH
ChenAdams0094

Keep those events available, but tell the seller that timing is uncertain. I once sent the right type of message from the wrong pause and confused the person helping us.

11
OM
OmarBrooks0839

Does acknowledge actually clear anything, or is it just closing the message?

13
LE
LeahAdams0147

Closes the message window. The program often resumes afterwards, which we'd taken to mean the button fixed it. The operator says she hasn't checked whether the two happen together.

9
CH
ChenAdams0094

That could explain why nobody thought to read it closely. The next photo should at least give support the condition the program was reporting.

16
LI
LinBrown0879

Film the display and the station in one shot if you can from outside the cell. Fancy close-ups can wait.

-7
LE
LeahAdams0147

There's a clear view from the operator position. I'll use that; last time I zoomed in on the gripper because I had already decided it was the culprit.

0
JA
JaneAllen0336

Send the installed program revision as well. Support needs to interpret the message from your version, particularly if the cell has been changed since delivery.

16
CH
ChenAdams0094

Has anyone changed the program since you received it?

3
LE
LeahAdams0147

The integrator changed the tray sequence during commissioning. Revision is on the backup, so I've sent it and asked the seller whether their support person has that version.

2
CH
ChenAdams0094

They may have been reading the old sequence all along. Did they reply?

19
OM
OmarBrooks0839

Any luck catching the actual message yet?

20
LE
LeahAdams0147

Caught it yesterday: waiting for tray exchange complete. The tray station was still finishing its own sequence. Seller also confirmed they had the pre-commissioning program, which hasn't helped this discussion.

13
LI
LinBrown0879

There we go. Send that same occurrence's log too.

10
JA
JaneAllen0336

Have the integrator provide the current interface notes to support. They should identify when tray exchange complete is expected and what the program does while waiting.

20
CH
ChenAdams0094

Was that particular pause expected according to the integrator? I'm wondering whether some of your stops are simply the tray station taking longer.

14
LE
LeahAdams0147

That one was expected. We still have two older reports with too little information to explain. I'm keeping the ticket open for those and using the photo-and-time note from now on.