简体中文界面。帖子、指南及政策正文保留原文;未对原文作自动翻译。

Separating fit-up, restraint and final inspection (Fairino FR10)

KaiChen1150 · 2026年8月3日 06:31 UTC

回复讨论
KA
KaiChen1150
I'm reviewing historical records for our planned defining dimensional control for bracket welding with Fairino FR10 and a steel gusseted bracket assembly in a robotic welding project review. The notes describe alignment under restraint but dimensions outside the drawing requirement after release. I'd like to distinguish incoming fit-up, fixture location and final acceptance before carrying an unexplained correction routine into the new cell; no live welding adjustments are involved.

10 条回复

HA
HassanBrown0878

Does the inspection procedure define the released condition and reference supports? Check that alongside whether each old measurement says how the assembly was held.

7
KA
KaiChen1150

@HassanBrown0878 My sheets contain both restrained and released results, with some conditions unlabelled. Although the drawing specifies the dimension, the inspection procedure doesn't clearly define the supports.

21
HA
HassanBrown0878

Have quality and the drawing owner define the acceptance condition. Group the old results by known measurement state; that should make them comparable.

24
JO
JonasAbbott0024

@HassanBrown0878 Same restraint label still doesn't mean comparable. Unknown supports and mixed fixture or process revisions could remain inside those groups.

9
HA
HassanBrown0878

That's a fair correction. State grouping addresses only one source of difference; the review also needs support conditions and fixture and process references, with missing information explicitly identified.

21
KA
KaiChen1150

@HassanBrown0878 Should a fixture revision remain unknown when a colleague remembers a likely version but no record confirms it? We're disagreeing about whether to fill those gaps.

11
HA
HassanBrown0878

Mark it unknown. You can note the recollection separately as something to investigate, but don't turn a probable revision into a recorded fact.

6
TO
TobyBrooks0840

@HassanBrown0878 I had a separate bracket job where inferred fixture revisions created an apparent trend. Once the original sheets established the revisions, the trend no longer held.

18
KA
KaiChen1150

@TobyBrooks0840 My review approach is settled: establish the acceptance condition and use measurements with identifiable conditions. I can take that forward while leaving fixture and process changes dependent on specialist assessment.

19
HA
HassanBrown0878

You've answered how to frame the records review, with any design or process change still dependent on what the specialists establish.

21

参与讨论

欢迎来到 Application Robot

所有人都可以阅读论坛。登录或注册后即可发起讨论、回复或上传照片。

忘记密码?

注册账号即表示你同意我们的 使用条款 社区准则。请阅读我们的 隐私政策 ,了解我们如何处理你的信息。