Cannot choose the FR10 stand from another finger-only picture

Lewis_Blair · 2025年12月25日 08:34 UTC

已关闭
LE
Lewis_Blair
They've coloured the blank in our FR10 sketch, but still left out the gripper body and open door; how am I meant to choose a stand position from that?

18 条回复

EL
ElliotBrown0944

Ask the layout owner to list the missing geometry on that view. Full tool assembly, held blank and actual door position are needed for the route check. A coloured part doesn't fill those gaps.

7
LE
Lewis_Blair

Toolmaker owns the body drawing, integrator owns the layout; neither seems to own putting them together

10
IS
IsabelArcher0387

I'd ask the integrator to confirm who will assess the combined arrangement, Lewis. I've also been chasing a combined view on a fixture-loading proposal. Having all the separate drawings in my inbox still doesn't tell me whether their revisions belong together.

16
OW
OwenAbbott0051

Our handovers have confused an installation shortage with a spare before. Here I would name the missing drawing, not say the gripper is missing, if the physical tool already exists.

20
LE
Lewis_Blair

Only proposed tooling, Owen, no physical gripper yet; missing drawing is the right wording anyway

8
IS
IsabelAbbott0039

Include the proposed connections behind the body in the assembly request, with their routing needs, since a body outline alone may still leave the most awkward part unspecified.

9
EL
ElliotBrown0944

And define the required movements. Reach to the loading pose is one check. Entering with the blank, opening for release and withdrawing are other parts of the same job.

5
IS
IsabelArcher0387

Elliot, I'd put those on the same drawing request. Separate emails about each omission were getting me separate replies, all perfectly responsive and none showing the combined job.

14
LE
Lewis_Blair

Integrator has taken the combined review; release, withdrawal and connections are in one request, with the proposed assembly revision named

16
OW
OwenAbbott0051

Who supplies the door survey, Lewis?

20
LE
Lewis_Blair

Our maintenance lead; survey requested, not done yet, so the open panel stays marked unknown

22
IS
IsabelAbbott0039

Have that survey identify the intended open position and relevant projections as well as the opening, otherwise the layout may gain an accurate hole while still omitting the door beside it.

9
IS
IsabelArcher0387

Does the setter need that same front area for fixture removal? I would include it now if so, even though you haven't chosen a stand or proposed moving one.

11
LE
Lewis_Blair

Yes, fixture comes out at the front; I've got the setter on the review list now

7
EL
ElliotBrown0944

Ask the setter to show the removal route, not only where they stand. The fixture itself needs somewhere to go once it is out.

18
LE
Lewis_Blair

He's marked that on the planning copy; thanks, Elliot, I'd only drawn his standing space

10
OW
OwenAbbott0051

Did maintenance get the door position measured?

6
LE
Lewis_Blair

Door survey is back; tool connections still undefined, so the combined assessment and stand choice are waiting on those