We're considering Fairino FR5 for machine fixture loading with a short steel blank in a production cell beside an enclosed mill, with 78 planned. The sketch reaches the fixture.
Trouble is, we left out the gripper body and open door. I'd like to check access properly before choosing an arm.
Start from those measurements and review approach and withdrawal offline with the full tool, cables and maintenance access included. A revised mount then needs the integrator's assessment
Yes, I made that sound more certain than it's. Compare candidate geometry in the measured layout; a larger arm is only useful if the complete approach improves
@HanaBrown0883 We had a different machine application where a good transfer layout put the pedestal across a service panel. Maintenance spotted the catch immediately.
A removable base adds relocation and installation checks to the work. Have the integrator weigh that against keeping normal service access clear in the layout