Put a normal request on paper and ask each side what happens next. Name receipt separately from area available before arguing over which ready is correct.
简体中文界面。帖子、指南及政策正文保留原文;未对原文作自动翻译。
Can't approve ready while the two suppliers mean different things
LuisBaker0521 · 2025年8月30日 05:08 UTC
17 条回复
Machine team says it can acknowledge while still finishing the previous operation.
16分Then that acknowledgement cannot serve as loading-area availability in the integrator's sequence. Give those conditions different names in the proposed interface.
6分Do both teams have the same view of when the request ends? Renaming ready helps, but it may reveal a second disagreement about clearing the request.
8分No. Machine team clears on receipt. Integrator expects it retained until the transfer is complete.
19分You need one agreed lifecycle, not just two renamed bits. Identify who raises each condition, who acknowledges it, what keeps it valid and what clears it. Walk through a busy machine as well as the easy idle case.
10分Our display called both states waiting. Name the thing each side is waiting for.
7分Owen, could your operator tell which team to call from the revised wording? That's where our first draft usually falls short.
7分Draft now separates request received, loading area available and transfer complete. The suppliers are reviewing the clear conditions together.
20分Include connection loss in that review. A retained request can look perfectly reasonable on each side while they disagree about whether it still belongs to the current transfer.
10分Jasper, yes, after we added the station name and an escalation contact. Waiting alone sent everyone to maintenance.
6分Busy-machine walkthrough agreed. Connection loss exposes an old request that the integrator wants to retry automatically. Machine team hasn't agreed.
7分Leave automatic retry out until the outcome can be reconciled. A lost connection does not tell either team whether the requested work happened. The interface owner needs to define what evidence permits recovery.
7分Who is acting as interface owner here? Two suppliers agreeing their own halves is how you got this ready problem.
5分Our controls lead is taking that role. Unknown outcomes will remain held for the reviewed recovery path.
18分Have the controls lead keep the interrupted example with the interface document. It explains why request received must not be presented as completed, even after the labels look tidy.
9分Normal sequence definitions agreed. Recovery still under review. New names are in both drawings; no automatic resend approved.