DanielBell0652
Our commissioning monitor adds a coupon after reconnect without another inspection. Completion stayed high through the outage. I want the retained job identified before anyone clears the bit to tidy the display.

4 条回复

CA
CalebBennett0754

Does the retained state include an attempt identifier you can compare with the saved result?

24
DA
DanielBell0652

PLC retains a result reference. Monitor only logged the bit. Controls is checking which completed attempt that reference describes; no repeat request sent.

5
CA
CalebBennett0754

Did that reference match an existing result, or is it still unresolved?

24
IM
ImranChan1088

Our operator once treated an unresolved row as a new inspection to run, so give this one a clear review owner while controls traces it; an uncertain result is not an empty work slot.